Plumbing Rough-in | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PASS |
Daryl Spivey
|
|
|
rough in inspection Phone #: ###-#### Inspection requested via web by coelho plumbing
|
Water and/or Sewer | 5/27/2020 | 5/28/2020 | 5/28/2020 | P | PART |
Daryl Spivey
|
|
|
please call me before, need it after 2.30 if possiable Phone #: ###-#### Inspection requested via web by coelho plumbing water serv ok.........installed prv for high pressure
|