Final | 7/30/2020 | 7/31/2020 | 7/31/2020 | A | PASS |
Dan Ediger
|
|
|
screened // Nathan Phone #: ###-####
|
Plumbing Rough-in | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | PASS |
Daryl Spivey
|
|
|
screened // Nathan Phone #: ###-####
|
Plumbing Rough-in | 6/10/2020 | 6/11/2020 | 6/11/2020 | A | CANC |
Daryl Spivey
|
|
|
Screened - Nate Phone #: ###-####
|
Groundwork | 6/11/2020 | 6/11/2020 | 6/11/2020 | A | PASS |
Daryl Spivey
|
|
|
Screened - Nate Phone #: ###-####
|
Water and/or Sewer | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | PASS |
Daryl Spivey
|
|
|
Nate Phone #: ###-#### water line ok..........
|
Water and/or Sewer | 6/2/2020 | 6/3/2020 | 6/3/2020 | A | FAIL |
Daryl Spivey
|
|
|
Nathan Phone #: ###-#### water line not installed to required depth to prevent freezing........ds
|
Water and/or Sewer | 5/28/2020 | 5/29/2020 | 5/29/2020 | A | PART |
Daryl Spivey
|
|
|
Screened- Nate Phone #: ###-#### outside sewer line tested ok........ds
|