Final | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by James Walsh
|
Plumbing Rough-in | 7/28/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Matt Wrobel
|
|
|
later in the day if possible Phone #: ###-#### Inspection requested via web by James Walsh
|
Groundwork | 7/12/2020 | 7/13/2020 | 7/13/2020 | A | PART |
Matt Wrobel
|
|
|
Should be open by 8 am Inspection requested via web by James Walsh need stamped approved prints on rough in in review now cover at own risk
|