Final | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by SARA GREENHALGH
|
Plumbing Rough-in | 7/15/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Matt Wrobel
|
|
|
PLUMBER WILL BE TEXTING PICTURES OF GROUND WORK THAT WAS DONE AT THE SAME TIME AS ROUGH. PLUMBER GALEN ###-#### Phone #: ###-#### Inspection requested via web by SARA GREENHALGH
|