Water and/or Sewer | 8/12/2020 | 8/13/2020 | 8/13/2020 | P | PART |
Matt Wrobel
|
|
|
Inspect Water Line Phone #: ###-#### Inspection requested via web by Teryn Irby corner of bldg to 50 feet frp, termination point
|
Water and/or Sewer | 8/12/2020 | 8/12/2020 | 8/12/2020 | P | PART |
Matt Wrobel
|
|
|
Inspect Water Line Phone #: ###-#### Inspection requested via web by Teryn Irby 8 inch water sewrvice meyer to corner of bldg, need pour thrust blocks
|
Water and/or Sewer | 8/12/2020 | 8/12/2020 | 8/12/2020 | A | PART |
Dan Ediger
|
|
|
I was notified by Granite Excavation that the builder is changing the size of the water service from 4" to 8". Granite will install the 8" while the contractor is submitting for a plan modification.
|
Other | 8/10/2020 | 8/11/2020 | 8/11/2020 | A | PASS |
Dan Ediger
|
|
|
Meet with inspector to go over project. Phone #: ###-#### Inspection requested via web by Teryn Irby. Discussed the water service and sewer inspecitons. Contractor will schedule and call 30 min. prior to inspection. Can cover with pictures except first and last joints. Will bring tracer wire up to surface and tie-into a ground rod if tracer wire is not present on water service stub-out.
|
Water and/or Sewer | 8/13/2020 | 8/14/2020 | | A | |
Matt Wrobel
|
|
|
Inspect Water Line Phone #: ###-#### >> Inspection requested via web by Teryn Irby
|