INSP - Final | 10/30/1995 | 10/30/1995 | 10/30/1995 | P | PASS |
Jim Soden
|
|
|
10/30/95 347 - W/C 3 BASIN 5 TUB 2 SHR 2 SINK 1 A/W 1 W/H 1 L/T 1
|
INSP - Final | 10/26/1995 | 10/27/1995 | 10/27/1995 | A | NR |
Jim Soden
|
|
|
10/26/95 347 - NOT READY
|
INSP - Sewer line | 10/10/1995 | 10/10/1995 | 10/10/1995 | | NR |
Gerry Varner
|
|
|
/ / 323 - not ready
|
INSP - Sewer line | 10/10/1995 | 10/10/1995 | 10/10/1995 | P | PASS |
Stan Johnson
|
|
|
10/10/95 352 -
|
INSP - Plumbing Rough-in | 8/30/1995 | 8/31/1995 | 8/31/1995 | A | PASS |
Jim Soden
|
|
|
08/30/95 347 - CORRECTION MADE O/K ROUGHIN OK FIXTURE COUNT W/C 3 BASIN 5 TUB 2 SHR 2 SINK 1 WASHER 1 LAUNDRY TRAY 1
|
INSP - Plumbing Rough-in | 8/28/1995 | 8/29/1995 | 8/29/1995 | A | CANC |
Jim Soden
|
|
|
08/29/95 347 - JIM PLEASE GET FIXTURE COUNT ALL WE HAVE IS W/S
|
INSP - Plumbing Rough-in | 8/28/1995 | 8/28/1995 | 8/28/1995 | P | CANC |
Gerry Varner
|
|
|
08/28/95 323 - NEEDS ADDITIONAL FIXTURES jims sodens area
|
INSP - Sewer line | 7/10/1995 | | 7/10/1995 | | PART |
|
|
|
PARTIAL SEWER OK
|
INSP - Water lines | 7/10/1995 | | 7/10/1995 | | OK |
|
|
|
10MIN
|