INSP - Final | 4/4/1996 | 4/4/1996 | 4/4/1996 | P | PASS |
Gary Ziegler
|
|
|
04/04/96 334 - REINSPECTION
|
INSP - Final | 4/2/1996 | 4/3/1996 | 4/3/1996 | A | NR |
Gary Ziegler
|
|
|
04/03/96 334 - ALL OF BUILDING FINALED PLEASE.....
|
INSP - Plumbing Rough-in | 2/5/1996 | 2/6/1996 | 2/6/1996 | A | PART |
Bill VanDegrift
|
|
|
02/05/96 330 - I CALLED THE CONTRACTOR ON THIS ONE AND HE SAID IT WAS A
|
INSP - Final | 2/2/1996 | 2/5/1996 | 2/5/1996 | P | PART |
Bill VanDegrift
|
|
|
THIS IS FOR MONDAY PM-FOR BOTH TOP AND BOTTOM partial final ok 1st and 2nd floors need to set all equipment, and fixtures. temp occ ok
|
PLM - Partial final | 2/5/1996 | 2/5/1996 | 2/5/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - temp occ ok, need to set all equipment, all fixtures, ice ma softeners, c.o. covers, etc.
|
INSP - Final | 2/1/1996 | 2/1/1996 | 2/5/1996 | P | CANC |
Gary Ziegler
|
|
|
SECOND FLOOR AND PUBLIC REST ROOMS. FINAL BILL PICKED THIS UP FOR GZEIGLER
|
INSP - Final | 1/26/1996 | 1/29/1996 | 1/29/1996 | P | PART |
Gary Ziegler
|
|
|
01/29/96 334 - 3RD FLOOR ONLY TEMP GZ
|
INSP - Plumbing Rough-in | 1/19/1996 | 1/19/1996 | 1/19/1996 | P | PART |
Gary Ziegler
|
|
|
01/19/96 334 - LOOK IN MEC. ROOM OR SECOND FLOOR SOMEONE WILL BE THERE. 2nd floor corridor ok to cover
|
INSP - Plumbing Rough-in | 12/6/1995 | 12/7/1995 | 12/7/1995 | A | PASS |
Bill VanDegrift
|
|
|
12/07/95 330 - AFTER 10;00 r/i ok east section
|
INSP - Plumbing Rough-in | 12/6/1995 | 12/6/1995 | 12/6/1995 | P | PART |
Bill VanDegrift
|
|
|
12/06/95 330 - EAST WING READY AFTER 2;00 GAVE TO LEE
|
INSP - Plumbing Rough-in | 10/6/1995 | 10/6/1995 | 10/6/1995 | P | PART |
Stan Johnson
|
|
|
10/09/95 352 - PARTIAL RI
|
INSP - Plumbing Rough-in | 10/2/1995 | 10/2/1995 | 10/3/1995 | P | CANC |
Gary Ziegler
|
|
|
10/02/95 334 - PARTIAL R/I ON AREA E--AFTER 3:00
|
INSP - Ground work | 8/18/1995 | 8/18/1995 | 8/18/1995 | | PART |
Gary Ziegler
|
|
|
/ / 334 - partial roof drains outside of building job is almost comple set sand and grease interceptor and associated piping
|
INSP - Ground work | 8/17/1995 | 8/17/1995 | 8/17/1995 | P | PASS |
Gary Ziegler
|
|
|
ready anytime
|
INSP - Framing/ Rough-in | 8/16/1995 | 8/16/1995 | 8/16/1995 | P | PART |
Gary Ziegler
|
|
|
UG RAIN DRAINS
|
INSP - Ground work | 8/1/1995 | 8/1/1995 | 8/2/1995 | | PASS |
Gary Ziegler
|
|
|
08/01/95 334 - READY LATE PM TODAY-LABOR AND TRIM
|
INSP - Framing/ Rough-in | 7/27/1995 | 7/27/1995 | 7/28/1995 | A | PART |
Gary Ziegler
|
|
|
07/28/95 334 - groundwork ok gz southwest wing bob farber said musgrove has drawings ready for resubmittal they are waiting for tml changes to submit at the same time gz
|
INSP - Ground work | 7/26/1995 | 7/26/1995 | 7/26/1995 | | PART |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Underground | 7/24/1995 | 7/24/1995 | 7/24/1995 | | PASS |
Bill VanDegrift
|
|
|
/ / 330 - partial g/w ok , approval pending resubmital of food service from public works. this g/w is form new public restroom to the north eas corner of project.
|