INSP - Final | 11/8/1995 | 11/8/1995 | 11/8/1995 | P | PASS |
Bill VanDegrift
|
|
|
11/08/95 330 - 3-WC,4-LAV,2-TUB,1-SH,2-SI,1-WB,1-WH
|
INSP - Final | 10/18/1995 | 10/18/1995 | 10/18/1995 | P | NR |
Bill VanDegrift
|
|
|
10/18/95 330 - no access wet floors
|
INSP - Framing/ Rough-in | 8/18/1995 | 8/18/1995 | 8/18/1995 | P | PASS |
Bill VanDegrift
|
|
|
08/18/95 330 - WASTE DRAINAGE REINSPECTION r/i ok
|
INSP - Framing/ Rough-in | 8/17/1995 | 8/17/1995 | 8/17/1995 | P | FAIL |
Bill VanDegrift
|
|
|
08/17/95 330 - correction waste and vent test failed 3-wc,5-lav,2-tub,1-sh,2-si,1-wb,1-wh
|