INSP - Final | 10/2/1995 | 10/2/1995 | 10/2/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Final | 9/29/1995 | 9/29/1995 | 9/29/1995 | P | FAIL |
Jim Soden
|
|
|
09/29/95 347 - FIXTURE COUNT W/C 2 BASIN 3 TUB 2 SHR 1 SINK 1 WASHER 1 W XXXXXXXXXXXXXXXXXXXXTHIS CORRECTION STILL HAS NOT BEEN TAKEN CARE OF!
|
INSP - Final | 9/28/1995 | 9/28/1995 | 9/28/1995 | P | FAIL |
Jim Soden
|
|
|
09/28/95 347 - AROUND 3:00 TODAY REINSPECTION FEE 20.00 W/H LEAKS STILL NO ACCFSS TO JETTED TUB MOTOR W/C 2 BASIN 3 TUB 2 SHR 1 SINK 1 WASHER 1 W/H 1
|
INSP - Final | 9/26/1995 | 9/26/1995 | 9/26/1995 | P | CANC |
Jim Soden
|
|
|
09/26/95 347 -
|
INSP - Final | 9/22/1995 | 9/22/1995 | 9/22/1995 | P | FAIL |
Jim Soden
|
|
|
09/22/95 347 - CORRECTION JETTED TUB HAS NO ACCESS FOR JETTED TUB W/C 2 BASIN 3 TUB 2 SHR 1 SINK 1 WASHER 1 W/H 1
|
INSP - Framing/ Rough-in | 8/18/1995 | 8/18/1995 | 8/18/1995 | P | PASS |
Jim Soden
|
|
|
08/18/95 347 - FIXTURE COUNT W/C 2 BASIN 2 TUB 2 SHR 1 SINK 1 WASHER 1 W
|