INSP - Final | 3/6/1996 | 3/7/1996 | 3/7/1996 | A | PASS |
Jim Soden
|
|
|
03/06/96 347 - W/C 2 BASIN 4 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 WILL CAULK TUB & SHR FACEPLATES/TRIM CUT OFF T&P DISSCHARGE LINE TO 6" ABOVE GARAGE FLOOR
|
INSP - Plumbing Rough-in | 1/4/1996 | 1/4/1996 | 1/4/1996 | A | PASS |
Lee Rice
|
|
|
test ok
|
INSP - Conference | 1/2/1996 | 1/2/1996 | 1/2/1996 | | PART |
Jim Soden
|
|
|
/ / 347 - CONFERENCE DISCUSSED WHAT DIRECTION HE NEEDED TO GO FOR TESTING
|
INSP - Plumbing Rough-in | 12/29/1995 | 1/2/1996 | 1/2/1996 | A | CANC |
Jim Soden
|
|
|
12/29/95 347 -
|
INSP - Plumbing Rough-in | 12/29/1995 | 12/29/1995 | 12/30/1995 | A | CANC |
Jim Soden
|
|
|
12/28/95 347 -
|
INSP - Conference | 10/16/1995 | 10/16/1995 | 10/16/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 - PRECONSTRUCTION WITH HOMEOWNER/BUILDER
|
INSP - Ground work | 9/13/1995 | 9/13/1995 | 9/13/1995 | P | PASS |
Jim Soden
|
|
|
09/13/95 347 - reinspection WATER, SEWER & BACKFLOW O/K THERE IS NO GROUNDWORK
|
INSP - Ground work | 9/11/1995 | 9/12/1995 | 9/12/1995 | A | CANC |
Jim Soden
|
|
|
09/12/95 347 -
|
INSP - Sewer and Water lines | 9/11/1995 | 9/12/1995 | 9/12/1995 | A | PASS |
Jim Soden
|
|
|
09/12/95 347 -
|