INSP - Final | 1/3/1996 | 1/4/1996 | 1/4/1996 | A | PASS |
Stan Johnson
|
|
|
01/04/96 352 -
|
INSP - Plumbing Rough-in | 10/27/1995 | 10/30/1995 | 10/30/1995 | A | PASS |
Stan Johnson
|
|
|
10/30/95 352 -
|
INSP - Plumbing Rough-in | 10/26/1995 | 10/26/1995 | 10/26/1995 | P | NR |
Stan Johnson
|
|
|
10/26/95 352 - 4 W/C 6 BASIN 4 TUB 1 SHOWER 1 SINK 1 W/B 1 WH
|
INSP - Ground work | 8/28/1995 | 8/28/1995 | 8/28/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 - GROUNDWORK O/K
|
INSP - Ground work | 8/28/1995 | 8/28/1995 | 8/28/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 - GROUNDWORK O/K
|