INSP - Final | 2/28/1996 | 2/29/1996 | 2/29/1996 | A | PASS |
Jim Soden
|
|
|
W/C 3 BASIN 6 TUB 2 SHR 2 SINK 2 W/B 1 W/H 1 L/T 1 O/K 2/29/96 347/JWS
|
INSP - Plumbing Rough-in | 11/9/1995 | 11/9/1995 | 11/9/1995 | P | PASS |
Stan Johnson
|
|
|
11/09/95 352 -
|
INSP - Plumbing Rough-in | 11/8/1995 | 11/8/1995 | 11/8/1995 | P | FAIL |
Stan Johnson
|
|
|
11/08/95 352 - 19 FIXTURES drains ok water test failed down to 75#s requires 150#s fixture count right
|
INSP - Ground work | 9/7/1995 | 9/7/1995 | 9/7/1995 | P | PASS |
Jim Soden
|
|
|
09/07/95 347 - GROUND WORK O/K CORRECTIONS MADE OK
|
INSP - Sewer and Water lines | 9/6/1995 | 9/6/1995 | 9/6/1995 | P | FAIL |
Gerry Varner
|
|
|
09/06/95 323 - ready asap water test failed--lower water line at window well allowed sewer cover
|