INSP - Final | 10/24/1996 | 10/24/1996 | 10/24/1996 | A | PASS |
Jim Soden
|
|
|
|
INSP - Final | 9/30/1996 | 9/30/1996 | 10/1/1996 | P | PART |
Gary Ziegler
|
|
|
10/01/96 334 - building J
|
INSP - Sprinkler & Backflow | 5/7/1996 | 5/7/1996 | 5/7/1996 | | PASS |
Jim Soden
|
|
|
/ / 347 - B/F DEVICE OK
|
INSP - Plumbing Rough-in | 4/29/1996 | 4/29/1996 | 4/29/1996 | P | PASS |
Jim Soden
|
|
|
04/29/96 347 - BLDG J r/i o/k 4/29/6 347 w/c 24 basin 32 tub 24 sink 12
|
INSP - Ground work | 10/12/1995 | 10/13/1995 | 10/13/1995 | A | PASS |
Jim Soden
|
|
|
10/12/95 347 -
|