INSP - Final | 8/1/1996 | 8/1/1996 | 8/2/1996 | P | PASS |
Jim Soden
|
|
|
08/01/96 347 - FINAL OCCUPANCY O/K 8/2/6 347
|
INSP - Sprinkler & Backflow | 5/7/1996 | 5/7/1996 | 5/7/1996 | | PASS |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Plumbing Rough-in | 3/25/1996 | 3/25/1996 | 3/26/1996 | P | PASS |
Jim Soden
|
|
|
BLD Q
|
INSP - Ground work | 9/21/1995 | 9/21/1995 | 9/21/1995 | P | PASS |
Jim Soden
|
|
|
09/21/95 347 - ready after 2:00
|