INSP - Final | 10/24/1995 | 10/24/1995 | 10/24/1995 | P | PASS |
Stan Johnson
|
|
|
|
INSP - Final | 10/23/1995 | 10/23/1995 | 10/23/1995 | P | PASS |
Stan Johnson
|
|
|
10/23/95 352 -
|
INSP - Plumbing Rough-in | 9/14/1995 | 9/14/1995 | 9/14/1995 | P | PASS |
Gerry Varner
|
|
|
09/14/95 323 - rough-in ok
|
INSP - Plumbing Rough-in | 9/13/1995 | 9/13/1995 | 9/13/1995 | P | FAIL |
Gerry Varner
|
|
|
09/13/95 323 - 2 w/c 3 basin 2 tub 1 sink 1 washer 1 w/h corrections needed
|