INSP - Final | 1/2/1996 | 1/2/1996 | 1/2/1996 | P | PASS |
Stan Johnson
|
|
|
01/02/96 352 -
|
INSP - Final | 12/21/1995 | 12/22/1995 | 12/22/1995 | P | PART |
Stan Johnson
|
|
|
THIS IS FOR FRIDAY PM
|
INSP - Final | 12/22/1995 | 12/22/1995 | 12/22/1995 | P | PART |
Stan Johnson
|
|
|
12/22/95 352 - partial final need to set master bath fixtures
|
INSP - Plumbing Rough-in | 11/2/1995 | 11/2/1995 | 11/2/1995 | P | PASS |
Stan Johnson
|
|
|
11/02/95 352 - 4 W/C 4 BASIN 5 TUB 2 SINKS 1 W/B 1 W/H
|
INSP - Plumbing Rough-in | 11/1/1995 | 11/1/1995 | 11/1/1995 | P | NR |
Stan Johnson
|
|
|
11/01/95 352 - 4 W/C 4 BASIN 5 TUB SHOWER 2 SINKS 1 W/B 1 WH
|
INSP - Ground work | 9/15/1995 | 9/15/1995 | 9/15/1995 | P | PASS |
Jim Soden
|
|
|
09/15/95 347 - LATE PM
|