INSP - Final | 12/11/1995 | 12/11/1995 | 12/11/1995 | P | PASS |
Stan Johnson
|
|
|
12/11/95 352 - SHE SAID THIS WASN'T READY UNTIL PM
|
INSP - Final | 12/11/1995 | 12/11/1995 | 12/11/1995 | P | NR |
Stan Johnson
|
|
|
12/11/95 352 -
|
INSP - Plumbing Rough-in | 10/23/1995 | 10/23/1995 | 10/23/1995 | P | PASS |
Stan Johnson
|
|
|
10/23/95 352 - REINSPECTION
|
INSP - Plumbing Rough-in | 10/20/1995 | 10/20/1995 | 10/20/1995 | P | FAIL |
Stan Johnson
|
|
|
10/20/95 352 - READY AFTER 12:00 TODAY BASIC 9 FIXTURES nail plates required on wh risers also backing on wh stub outs drainage and water tests passed
|
INSP - Sewer and Water lines | 9/26/1995 | 9/26/1995 | 9/26/1995 | P | CANC |
Jim Soden
|
|
|
09/26/95 347 - READY AT 4:00 ì
|
INSP - Sewer line | 9/26/1995 | 9/26/1995 | 9/26/1995 | | PASS |
Gerry Varner
|
|
|
/ / 323 - sewer ok
|
INSP - Water lines | 9/26/1995 | 9/26/1995 | 9/26/1995 | | PASS |
Gerry Varner
|
|
|
/ / 323 - water line ok
|