INSP - Final | 12/8/1995 | 12/8/1995 | 12/8/1995 | | NR |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Final | 12/8/1995 | 12/8/1995 | 12/8/1995 | | PART |
Jim Soden
|
|
|
/ / 347 - REINSPECTION GAVE PARTIAL FINAL ONLY---X-RAY PROCESSOR NEEDS TO HAVE AN R/P DEVICE INSTALLED BEFORE THEY CAN USE IT. PLUMBER IS ON HIS WAY
|
INSP - Final | 12/8/1995 | 12/8/1995 | 12/8/1995 | | PART |
Jim Soden
|
|
|
/ / 347 - REINSPECTION GAVE PARTIAL FINAL ONLY---X-RAY PROCESSOR NEEDS TO HAVE AN R/P DEVICE INSTALLED BEFORE THEY CAN USE IT. PLUMBER IS ON HIS WAY
|
INSP - Final | 12/7/1995 | 12/8/1995 | 12/8/1995 | A | PART |
Bill VanDegrift
|
|
|
/ / 330 - gave to jim
|
INSP - Final | 12/8/1995 | 12/8/1995 | 12/8/1995 | | NR |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Final | 12/8/1995 | 12/8/1995 | 12/8/1995 | | NR |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Final | 12/6/1995 | 12/7/1995 | 12/7/1995 | A | PART |
Bill VanDegrift
|
|
|
12/06/95 330 - gave to jim
|
INSP - Final | 12/7/1995 | 12/7/1995 | 12/7/1995 | | CANC |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Final | 12/7/1995 | 12/7/1995 | 12/7/1995 | | CANC |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Plumbing Rough-in | 10/10/1995 | 10/10/1995 | 10/10/1995 | P | PART |
Gary Ziegler
|
|
|
10/10/95 334 - needs backflow device thermal exspansion tank gz
|