INSP - Final | 12/19/1995 | 12/20/1995 | 12/20/1995 | A | PASS |
Bill VanDegrift
|
|
|
12/19/95 330 - finol ok
|
INSP - Framing/ Rough-in | 11/16/1995 | 11/16/1995 | 11/16/1995 | | PASS |
Bill VanDegrift
|
|
|
/ / 330 - 3-wc,3-lav,1-tub,1-sh,1-si,1-wb,1-wh
|
INSP - Framing/ Rough-in | 11/16/1995 | 11/16/1995 | 11/16/1995 | | PASS |
Bill VanDegrift
|
|
|
/ / 330 - 3-wc,3-lav,1-tub,1-sh,1-si,1-wb,1-wh
|
INSP - Ground work | 10/11/1995 | 10/12/1995 | 10/12/1995 | A | PASS |
Bill VanDegrift
|
|
|
|