INSP - Final | 4/18/1996 | 4/18/1996 | 4/18/1996 | A | PASS |
Bill VanDegrift
|
|
|
|
INSP - Final | 1/2/1996 | 1/3/1996 | 1/3/1996 | A | PART |
Bill VanDegrift
|
|
|
01/03/96 330 - gave to lee
|
INSP - Final | 1/2/1996 | 1/2/1996 | 1/2/1996 | P | NR |
Bill VanDegrift
|
|
|
01/02/96 330 -
|
INSP - Plumbing Rough-in | 11/30/1995 | 12/1/1995 | 12/1/1995 | A | NR |
Bill VanDegrift
|
|
|
11/30/95 330 - said they wanted a pm insp
|
INSP - Plumbing Rough-in | 12/1/1995 | 12/1/1995 | 12/1/1995 | P | PASS |
Bill VanDegrift
|
|
|
12/01/95 330 - REINSPECTION FOR THE PM
|
INSP - Sewer and Water lines | 11/8/1995 | 11/9/1995 | 11/9/1995 | P | PASS |
Bill VanDegrift
|
|
|
11/09/95 330 - PARTIAL SEWER OK SUMP DISCHARGE ADDITIONAL 60' WATER LINE
|
INSP - Ground work | 10/27/1995 | 10/27/1995 | 10/27/1995 | | PASS |
Bill VanDegrift
|
|
|
/ / 330 -
|
INSP - Ground work | 10/25/1995 | 10/26/1995 | 10/26/1995 | A | CANC |
Bill VanDegrift
|
|
|
10/25/95 330 -
|
INSP - Water lines | 10/26/1995 | 10/26/1995 | 10/26/1995 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - partial w/l ok bldg plus 75'
|