INSP - Final | 7/2/1996 | 7/2/1996 | 7/2/1996 | P | PASS |
Gary Ziegler
|
|
|
|
INSP - Final | 6/14/1996 | 6/14/1996 | 6/17/1996 | P | PART |
Gary Ziegler
|
|
|
06/17/96 334 -
|
INSP - Plumbing Rough-in | 2/21/1996 | 2/21/1996 | 2/21/1996 | P | PASS |
Gary Ziegler
|
|
|
02/21/96 334 -
|
INSP - Plumbing Rough-in | 12/13/1995 | 12/14/1995 | 12/14/1995 | A | PART |
Bill VanDegrift
|
|
|
12/14/95 330 - PARTIAL//BLDG 8 post and beam
|
INSP - Ground Work/Sewer/Water | 11/3/1995 | 11/3/1995 | 11/3/1995 | P | PASS |
Gary Ziegler
|
|
|
11/03/95 334 - READY AFTER 2:00 TODAY
|