INSP - Final | 1/25/1999 | 1/25/1999 | 1/25/1999 | A | PASS |
Stan Johnson
|
|
|
|
INSP - Final | 2/20/1996 | 2/20/1996 | 1/25/1999 | P | PASS |
Gerry Varner
|
|
|
02/20/96 323 - this was completed by stan on 5-20-96 a.m.
|
INSP - Final | 2/16/1996 | 2/16/1996 | 2/16/1996 | P | FAIL |
Stan Johnson
|
|
|
02/16/96 352 - DOOR WILL BE OPEN pedistal lav needs caulked
|
INSP - Plumbing Rough-in | 12/4/1995 | 12/4/1995 | 12/4/1995 | P | PASS |
Stan Johnson
|
|
|
12/04/95 352 - 3 W/C 4 BASIN 3 TUB 1 SINK 1 W/B 1 W/H
|
INSP - Ground work | 10/30/1995 | 10/30/1995 | 10/30/1995 | P | PASS |
Jim Soden
|
|
|
|