INSP - Final | 3/18/1996 | 3/18/1996 | 3/18/1996 | P | PASS |
Jim Soden
|
|
|
03/18/96 347 - W/C 3 BASIN 4 TUB 2 SWINK 1 W/B 1 W/H 1
|
INSP - Plumbing Rough-in | 2/5/1996 | 2/5/1996 | 2/5/1996 | P | PASS |
Stan Johnson
|
|
|
|
INSP - Plumbing Rough-in | 12/27/1995 | 12/28/1995 | 12/28/1995 | A | FAIL |
Jim Soden
|
|
|
12/27/95 347 - W/C 3 BASIN 4 TUB 2 SINK 1 W/B 1 W/H 1 break under slab
|
INSP - Plumbing Rough-in | 11/17/1995 | 11/20/1995 | 11/20/1995 | A | PASS |
Jim Soden
|
|
|
11 FIXTURES
|
INSP - Ground Work/Sewer/Water | 11/9/1995 | 11/13/1995 | 11/13/1995 | A | PASS |
Jim Soden
|
|
|
11/13/95 347 -
|
INSP - Ground work | 11/12/1995 | 11/12/1995 | 11/12/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Sewer line | 11/12/1995 | 11/12/1995 | 11/12/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 -
|
INSP - Water lines | 11/12/1995 | 11/12/1995 | 11/12/1995 | | PASS |
Jim Soden
|
|
|
/ / 347 -
|