INSP - Final | 3/25/1996 | 3/26/1996 | 3/26/1996 | A | PASS |
Gary Ziegler
|
|
|
03/26/96 334 -
|
INSP - Final | 3/25/1996 | 3/25/1996 | 3/26/1996 | P | NR |
Gary Ziegler
|
|
|
03/25/96 334 -
|
INSP - Plumbing Rough-in | 1/16/1996 | 1/16/1996 | 1/16/1996 | P | PASS |
Bill VanDegrift
|
|
|
01/16/96 330 - 3 W/C 2 LAV 2 TUB 1 SINK 1 W/B 1 W/H correct fixture count 4-wc,5-lav,3-tub,1-sh,1-si,1-wb,1-wh
|
INSP - Ground Work/Sewer/Water | 12/4/1995 | 12/4/1995 | 12/4/1995 | P | PASS |
Bill VanDegrift
|
|
|
12/04/95 330 - REINSPECTION G/W S/W OK
|
INSP - Ground Work/Sewer/Water | 12/1/1995 | 12/4/1995 | 12/4/1995 | A | FAIL |
Bill VanDegrift
|
|
|
12/01/95 330 - g/w only basement fixtures thru backwater valae s/w not ready
|