INSP - Final | 3/14/1996 | 3/15/1996 | 3/15/1996 | A | PASS |
Stan Johnson
|
|
|
03/15/96 352 - INSTALLED RP VALVE
|
INSP - Final | 3/7/1996 | 3/7/1996 | 3/7/1996 | P | PART |
Stan Johnson
|
|
|
03/07/96 352 - signed temp. occ rp required in x-ray room hose bib use u
|
INSP - Plumbing Rough-in | 1/17/1996 | 1/17/1996 | 1/17/1996 | P | PASS |
Stan Johnson
|
|
|
01/17/96 352 - PARTIAL R/I total ri ok
|
INSP - Ground work | 12/8/1995 | 12/8/1995 | 12/8/1995 | P | PASS |
Stan Johnson
|
|
|
12/08/95 352 - after 2:00
|