INSP - Final | 2/22/1996 | 2/23/1996 | 2/23/1996 | A | PASS |
Gerry Varner
|
|
|
02/22/96 323 - REINSPECTION -- FINAL OK
|
INSP - Final | 2/21/1996 | 2/21/1996 | 2/21/1996 | P | FAIL |
Gerry Varner
|
|
|
02/21/96 323 - CORRECTION NEEDED
|
INSP - Plumbing Rough-in | 2/5/1996 | 2/6/1996 | 2/6/1996 | A | PASS |
Gerry Varner
|
|
|
02/05/96 323 - REINSPECTION rough-in ok
|
INSP - Plumbing Rough-in | 2/5/1996 | 2/5/1996 | 2/5/1996 | P | FAIL |
Gerry Varner
|
|
|
02/05/96 323 - corrections needed
|
INSP - Plumbing Rough-in | 2/2/1996 | 2/2/1996 | 2/2/1996 | P | NR |
Gerry Varner
|
|
|
02/02/96 323 - PLUMBING PIPING, WASTE AND VENT, PLUMBING FIXTURES. FRANK BLDG 2 VANILLA FINISH--not ready
|