INSP - Final | 6/24/1996 | 6/25/1996 | 6/25/1996 | A | PASS |
Jim Soden
|
|
|
CORRECT COUNT W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 W/S 1 FIN O/K 6/25/6 347
|
INSP - Plumbing Rough-in | 4/4/1996 | 4/4/1996 | 4/4/1996 | P | PASS |
Dave Lightfoot
|
|
|
04/04/96 337 - APT.1006 W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 R/I O/K 4/4/6 347
|
INSP - Plumbing Rough-in | 2/7/1996 | 2/7/1996 | 2/13/1996 | P | NR |
Gary Ziegler
|
|
|
02/07/96 334 - 10 FIXTURES...9 FLOOR...CALL DAVID ON HIS PAGER # AT 383- ACCESS...THIS IS A SECURED FLOOR AND HE WILL TELL YOU HOW TO GET IN
|
INSP - Plumbing Rough-in | 2/8/1996 | 2/8/1996 | 2/8/1996 | P | PASS |
Bill VanDegrift
|
|
|
CALL DAVID ON HIS PAGER ####-#### FOR ACCESS..THIS IS A SECURED FLOOR. partial r/i ok floor penatrations only
|
INSP - Plumbing Rough-in | 2/8/1996 | 2/8/1996 | 2/8/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - paartialr/i ok floor penatrations
|