INSP - Final | 4/9/1996 | 4/9/1996 | 4/9/1996 | P | PASS |
Bill VanDegrift
|
|
|
04/09/96 330 -
|
INSP - Plumbing Rough-in | 2/16/1996 | 2/16/1996 | 2/16/1996 | P | PASS |
Bill VanDegrift
|
|
|
02/16/96 330 - REINSPECTION
|
INSP - Plumbing Rough-in | 2/14/1996 | 2/14/1996 | 2/14/1996 | P | FAIL |
Bill VanDegrift
|
|
|
02/14/96 330 - 2 W/C 3 LAV 3 TUB 1 SINK 1 W/H 1 W/H water system test failed, hang 1 1/2" revents every 4' in both bath's
|
INSP - Plumbing Rough-in | 2/12/1996 | 2/12/1996 | 2/12/1996 | P | NR |
Bill VanDegrift
|
|
|
02/12/96 330 - 11 FIXTURES READY LATE PM
|