INSP - Final | 6/19/1996 | 6/19/1996 | 6/19/1996 | P | PASS |
Stan Johnson
|
|
|
06/19/96 352 -
|
INSP - Plumbing Rough-in | 4/19/1996 | 4/22/1996 | 4/22/1996 | A | PASS |
Stan Johnson
|
|
|
04/22/96 352 - RINSPECTION HE STATED HIS R/I FAILED SOMETHING ABOUT THE
|
INSP - Plumbing Rough-in | 4/18/1996 | 4/18/1996 | 4/18/1996 | P | PART |
Stan Johnson
|
|
|
04/18/96 352 - 14 FIXTURES...COMPUTER SAYS YOU WERE THERE ON 3/5 AND DID PLUMBING SAID ALL YOU DID WAS A S/W.. water test down to 120#s
|
INSP - Plumbing Rough-in | 3/5/1996 | 3/5/1996 | 3/5/1996 | | PASS |
Stan Johnson
|
|
|
03/05/96 352 - THIS IS READY AT 12:00...14 FIXTURES
|
INSP - Sewer and Water lines | 3/4/1996 | 3/5/1996 | 3/5/1996 | P | PASS |
Stan Johnson
|
|
|
water sewer
|