INSP - Final | 5/6/1996 | 5/7/1996 | 5/8/1996 | A | PASS |
Gary Ziegler
|
|
|
READY AT 11:00
|
INSP - Final | 5/6/1996 | 5/6/1996 | 5/6/1996 | P | CANC |
Gary Ziegler
|
|
|
AFTER 2:00...MOVE TO TUES
|
INSP - Plumbing Rough-in | 3/26/1996 | 3/26/1996 | 3/26/1996 | | PASS |
Gerry Varner
|
|
|
/ / 323 - ROUGH-IN OK
|
INSP - Plumbing Rough-in | 3/21/1996 | 3/21/1996 | 3/21/1996 | P | FAIL |
Gerry Varner
|
|
|
03/21/96 323 - 9 FIXTURES CORRECTION NEEDED___GAUGE ALL CRIMP RINGS AND CORRECT THOSE THAT FAIL____RETEST WATER AND CALL FOR RE-INSPECTION.
|