INSP - Final | 5/7/1996 | 5/7/1996 | 5/7/1996 | | PASS |
|
|
|
final ok with shower strainer installed as per jj const.
|
INSP - Final | 5/6/1996 | 5/6/1996 | 5/6/1996 | P | FAIL |
Bill VanDegrift
|
|
|
c.o. plugs required, shower strainer required
|
INSP - Plumbing Rough-in | 3/27/1996 | 3/27/1996 | 3/27/1996 | P | PASS |
Gary Ziegler
|
|
|
03/27/96 334 -
|
INSP - Plumbing Rough-in | 3/26/1996 | 3/26/1996 | 3/26/1996 | P | PASS |
Gary Ziegler
|
|
|
03/26/96 334 - 2 w/c 3 lav 2 tub 1 shower 1 sink 1 w/b 1 w/h and a laund
|