INSP - Final | 7/9/1996 | 7/9/1996 | 7/9/1996 | P | PASS |
Stan Johnson
|
|
|
07/09/96 352 - REINSPECTION water softner not hooked up co under steps to be moved
|
INSP - Final | 7/8/1996 | 7/9/1996 | 7/9/1996 | A | NR |
Stan Johnson
|
|
|
07/09/96 352 -
|
INSP - Plumbing Rough-in | 5/8/1996 | 5/8/1996 | 5/8/1996 | P | PASS |
Stan Johnson
|
|
|
05/08/96 352 - 16 FIXTURES
|
INSP - Plumbing Rough-in | 5/8/1996 | 5/8/1996 | 5/8/1996 | P | CANC |
Bill VanDegrift
|
|
|
16 FIXTURES..SENT TO STAN
|
INSP - Ground Work/Sewer/Water | 4/4/1996 | 4/4/1996 | 4/4/1996 | | PASS |
Gerry Varner
|
|
|
/ / 323 - SEWER - WATERR - GROUNDWORK OK
|
INSP - Ground Work/Sewer/Water | 4/3/1996 | 4/4/1996 | 4/4/1996 | A | PART |
Bill VanDegrift
|
|
|
04/03/96 330 - gave to jerry
|