INSP - Final | 8/2/1996 | 8/2/1996 | 8/2/1996 | | PASS |
Jim Soden
|
|
|
/ / 347 - W/C 1 BASIN 1 TUB 1 SINK 1 W/B 1 W/H 1 F/D W/PRIMER
|
INSP - Final | 8/2/1996 | 8/2/1996 | 8/2/1996 | | PASS |
Jim Soden
|
|
|
/ / 347 - W/C 1 BASIN 1 TUB 1 SINK 1 W/B 1 W/H 1 F/D W/PRIMER
|
INSP - Plumbing Rough-in | 4/23/1996 | 4/24/1996 | 4/24/1996 | A | PASS |
Jim Soden
|
|
|
04/23/96 347 - W FIXTURES W/C 1 BASIN 1 TUB 1 SINK 1 W/B 1 W/H 1 F/D 1 L/T R/I O/K 4/24/6 347
|