INSP - Final | 9/19/1996 | 9/20/1996 | 9/20/1996 | A | PASS |
Stan Johnson
|
|
|
09/20/96 352 - REINSPECTION
|
INSP - Final | 9/16/1996 | 9/16/1996 | 9/16/1996 | P | NR |
Stan Johnson
|
|
|
09/16/96 352 -
|
INSP - Plumbing Rough-in | 7/9/1996 | 7/9/1996 | 7/9/1996 | P | PASS |
Stan Johnson
|
|
|
REINSPECTION
|
INSP - Plumbing Rough-in | 7/8/1996 | 7/8/1996 | 7/8/1996 | P | FAIL |
Stan Johnson
|
|
|
07/08/96 352 - i am not sure what is going on this project has sewage ej hooked up if gravity sewer no backwater valve has been installed
|
INSP - Sewer and Water lines | 5/22/1996 | 5/22/1996 | 5/22/1996 | P | PASS |
Stan Johnson
|
|
|
05/22/96 352 -
|
INSP - Ground work | 5/8/1996 | 5/9/1996 | 5/8/1996 | A | PASS |
Stan Johnson
|
|
|
10FIXTURES
|