INSP - Plumbing Rough-in | 8/7/1996 | 8/7/1996 | 8/7/1996 | P | CANC |
Gary Ziegler
|
|
|
WALLS IN FISH AND MEAT DEPT DONNA CALLED IN ON WRONG PERMIT
|
INSP - Final | 7/15/1996 | 7/15/1996 | 7/15/1996 | P | PASS |
Gary Ziegler
|
|
|
reinspection
|
INSP - Final | 7/8/1996 | 7/8/1996 | 7/8/1996 | P | FAIL |
Gary Ziegler
|
|
|
provide 1in airgap on wasteline for icemaker black elecrical a\tape is not a approved joining method gz
|
PLM - Partial final | 6/25/1996 | 6/25/1996 | 6/25/1996 | P | PASS |
Gary Ziegler
|
|
|
TEMPORARY OCC FOR ALBERTSONS
|
INSP - Plumbing Rough-in | 6/12/1996 | 6/12/1996 | 6/12/1996 | | PART |
Gary Ziegler
|
|
|
/ / 334 - 2nd floor albertsons remodel needs hangars on copper to icem hangars 1st floor hallway 2in cast waste
|
INSP - Ground work | 5/31/1996 | 5/31/1996 | 5/31/1996 | P | FAIL |
Gary Ziegler
|
|
|
WASTE VENT AND WATER REMODEL RESTROOM ALBERTSONS RIVERVIEW PLAZA 2ND FLOOR-$3,800.00 stop work no plumbing plans check permit value placed stop work order on this jobsite submit 2 sets of 18x24 plumbing plans to the city for review
|