INSP - Final | 9/13/1996 | 9/13/1996 | 9/13/1996 | P | PASS |
Gary Ziegler
|
|
|
09/13/96 334 - ALL DONE BUT ONE LAV FAUCET IS MISSING, WRONG ONE CAME IN WILL BE IN MONDAY. BUILDER NEEDS FINALED. QUESTIONS CALL JOHN AT 887-518
|
INSP - Plumbing Rough-in | 7/16/1996 | 7/16/1996 | 7/16/1996 | | PART |
|
|
|
top roughin only resize water and waste in the crawlspace
|
INSP - Plumbing Rough-in | 7/15/1996 | 7/15/1996 | 7/15/1996 | P | FAIL |
Gary Ziegler
|
|
|
|
INSP - Sewer and Water lines | 6/6/1996 | 6/6/1996 | 6/6/1996 | P | PASS |
Gary Ziegler
|
|
|
WILL BE CALLING INSPECTOR TO SEE IF A.M. INSPECTION POSSIBLE.
|