INSP - Final | 9/3/1996 | 9/3/1996 | 9/3/1996 | P | PASS |
Gary Ziegler
|
|
|
09/03/96 334 - WILL BE OPEN
|
INSP - Plumbing Rough-in | 7/10/1996 | 7/10/1996 | 7/10/1996 | | PASS |
Stan Johnson
|
|
|
/ / 352 -
|
INSP - Plumbing Rough-in | 7/10/1996 | 7/10/1996 | 7/10/1996 | | PASS |
Stan Johnson
|
|
|
/ / 352 -
|
INSP - Plumbing Rough-in | 7/8/1996 | 7/8/1996 | 7/8/1996 | P | FAIL |
Stan Johnson
|
|
|
07/08/96 352 - 4-W/C, 6-LAV, 4-T/S, 1-K/S, 1-W/H, 1-C/W, 1-L/T water test failed wh stubs to short only 16"
|
INSP - Ground Work/Sewer/Water | 6/6/1996 | 6/6/1996 | 6/6/1996 | P | CANC |
Stan Johnson
|
|
|
06/06/96 352 - GROUND WORK ONLY.
|