INSP - Final | 10/10/1996 | 10/10/1996 | 10/10/1996 | | PASS |
|
|
|
the work covered by this permit was completed by D&Z plumbing under permit plm96-2302
|
INSP - Plumbing Rough-in | 6/25/1996 | 6/25/1996 | 6/25/1996 | | PART |
|
|
|
partial r/i ok,iw, direc, basement thru mech space below 1st. floor. test witnessed by MTI accepted, will call for inspection and test witness on any further work.
|
INSP - Plumbing Rough-in | 6/24/1996 | 6/24/1996 | 6/24/1996 | P | PART |
Bill VanDegrift
|
|
|
06/24/96 330 - WASTE LINE partial r/i ok solvent waste walk thru on rem
|