INSP - Ground work | 10/9/1996 | 10/9/1996 | 10/9/1996 | P | PART |
Bill VanDegrift
|
|
|
10/09/96 330 - CALLED YOU TO SET THE APT. waterline between 10a and b
|
INSP - Water lines | 9/25/1996 | 9/25/1996 | 9/25/1996 | P | PASS |
Gerry Varner
|
|
|
09/25/96 323 - BUILDING 10A-CONTACT: RANDY TROUTMAN ###-#### THIS IS AT WATER LINE STUBBED TO WITH IN 7 FEET OF BLDG. WATER NOT ON. WILL TEST LINE WHEN PLBR EXTENDS LINE UP IN BLDG .
|
INSP - Water lines | 7/12/1996 | 7/12/1996 | 7/12/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - all thats left is tie in at bldg 22 and the disconnect to fa
|
INSP - Water lines | 7/11/1996 | 7/11/1996 | 7/11/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - tie in to 3" heading to hazardous material area incomplete
|
INSP - Water lines | 7/10/1996 | 7/11/1996 | 7/11/1996 | A | PASS |
Bill VanDegrift
|
|
|
07/11/96 330 - PRESSURE TEST-AT 8AM. test ok
|
INSP - Water lines | 7/2/1996 | 7/2/1996 | 7/2/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - partial water line ok, offset east, to fence line
|
INSP - Water lines | 6/28/1996 | 6/28/1996 | 6/28/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - apx. 40' past fab1x tie in ok.
|
INSP - Water lines | 6/27/1996 | 6/27/1996 | 6/27/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - ABOUT 100' TODAY ALMOST TO THE LOADING DOCK AT FAB 1
|
INSP - Water lines | 6/26/1996 | 6/26/1996 | 6/26/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - partial water line ok their up even with the access road in
|
INSP - Water lines | 6/25/1996 | 6/25/1996 | 6/25/1996 | | PART |
Bill VanDegrift
|
|
|
/ / 330 - PARTIAL WATER LINE OK, THEIR DOWN TO WITH IN ABOUT 200' OF T 1, OK TO THIS POINT,
|
INSP - Water lines | 6/18/1996 | 6/19/1996 | 6/19/1996 | A | PART |
Bill VanDegrift
|
|
|
06/18/96 330 - partial water line ok, dibble will have the plans on the afternoons inspection, it will be an on going job, tie in pluss 200'
|