INSP - Final | 9/26/1996 | 9/26/1996 | 9/26/1996 | P | PASS |
Stan Johnson
|
|
|
09/26/96 352 - REINSPECTION
|
INSP - Final | 9/24/1996 | 9/24/1996 | 9/24/1996 | P | FAIL |
Stan Johnson
|
|
|
09/24/96 352 - dish washer hose requires hanger hot water to lavs not tu
|
INSP - Plumbing Rough-in | 6/19/1996 | 6/20/1996 | 6/20/1996 | A | PASS |
Stan Johnson
|
|
|
3 W/C 5 LAV 1 K/S 1 L/T 1 C/W 1 W/H 2 SHR 1 T/S 1 SOAKING TUB.
|