INSP - Final | 7/29/1996 | 7/30/1996 | 7/30/1996 | P | PASS |
Jim Soden
|
|
|
07/30/96 347 -
|
INSP - Final | 7/29/1996 | 7/29/1996 | 7/29/1996 | P | PASS |
Jim Soden
|
|
|
07/29/96 347 - W/C 2 BASIN 3 TTUB 1 SHR 1 SINK 1 W/B 1 W/H 1 FINAL O/K 7/29/6 347
|
INSP - Plumbing Rough-in | 6/25/1996 | 6/25/1996 | 6/25/1996 | P | PASS |
Jim Soden
|
|
|
READY AFTER 3:00 TODAY BASIC 9 FIXTURES COUNT INCORRECT W/C 2 BASIN 3 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 R/I O/K 6\25\6 347
|