INSP - Final | 12/6/1996 | 12/6/1996 | 12/6/1996 | | PASS |
Gerry Varner
|
|
|
/ / 323 - FINAL OK
|
INSP - Final | 12/3/1996 | 12/3/1996 | 12/3/1996 | P | NR |
Gerry Varner
|
|
|
12/03/96 323 - CORRECTION STILL NEEDED__ DBLE CHECK INSTALLED , MAY NEED
|
INSP - Final | 11/6/1996 | 11/6/1996 | 11/6/1996 | P | PART |
Gerry Varner
|
|
|
11/06/96 323 - family vision clinic GAVE TEMPERARY OCC. ONLY
|
INSP - Final | 11/1/1996 | 11/1/1996 | 11/1/1996 | P | CANC |
Gerry Varner
|
|
|
AFTER 3:00 GAVE TO BILL
|
INSP - Final | 11/1/1996 | 11/1/1996 | 11/1/1996 | | PART |
Bill VanDegrift
|
|
|
11/01/96 330 - AFTER 3:00 set all fixtures test dcva
|
INSP - Miscellaneous | 10/1/1996 | 10/1/1996 | 10/1/1996 | P | PASS |
Gerry Varner
|
|
|
10/01/96 323 - ROOF DRAINS OK
|
INSP - Plumbing Rough-in | 9/30/1996 | 9/30/1996 | 9/30/1996 | P | PASS |
Gerry Varner
|
|
|
09/30/96 323 - reinspection ___ ROUGH-IN OK
|
INSP - Plumbing Rough-in | 9/26/1996 | 9/26/1996 | 9/26/1996 | P | FAIL |
Gerry Varner
|
|
|
09/26/96 323 - CORRECTIONS NEEDED
|
INSP - Ground work | 7/3/1996 | 7/3/1996 | 7/3/1996 | P | PASS |
Gary Ziegler
|
|
|
|
INSP - Ground work | 6/27/1996 | 6/28/1996 | 6/28/1996 | A | CANC |
Gerry Varner
|
|
|
06/27/96 323 - PARTIAL GROUNDWORK WILL CALL FOR THE PM 6-27-96 INSPECTED THIS ON 6-27-96 ___ PARTIAL R.I. APPROVED
|
INSP - Ground work | 6/27/1996 | 6/27/1996 | 6/27/1996 | | PART |
Gerry Varner
|
|
|
/ / 323 - PARTIAL GROUND WORK AND UNDER SLAB WATER SERVICE __ PARTIAL
|