INSP - Sewer line | 2/7/1997 | 2/7/1997 | 2/7/1997 | | PASS |
Gary Ziegler
|
|
|
/ / 334 - final ok gz
|
INSP - Conference | 2/6/1997 | 2/6/1997 | 2/6/1997 | | PASS |
|
|
|
talk with contractor about final inspection requirements
|
INSP - Sewer line | 2/6/1997 | 2/6/1997 | 2/6/1997 | | PART |
Gary Ziegler
|
|
|
clean and flush all manholes and call for reinspection for final inspections gz
|
INSP - Sewer line | 7/3/1996 | 7/3/1996 | 7/3/1996 | P | PART |
Gary Ziegler
|
|
|
INSTALL SEWER LINES AND MANHOLES-BLD96-1602-$8,500.00-E./ PARKCENTER SOUTH OF RIVER RUN
|