INSP - Final | 10/3/1996 | 10/3/1996 | 10/3/1996 | P | PASS |
Gerry Varner
|
|
|
10/03/96 323 - TWO BATHROOMS __ BATHROOMS FINAL
|
INSP - Plumbing Rough-in | 7/16/1996 | 7/17/1996 | 7/17/1996 | A | PASS |
Gerry Varner
|
|
|
07/17/96 323 - REINSPECTION __ ROUGH-IN OK
|
INSP - Plumbing Rough-in | 7/16/1996 | 7/16/1996 | 7/17/1996 | P | FAIL |
Gerry Varner
|
|
|
07/16/96 323 - reinspection __ CORRECTION STILL NEEDED
|
INSP - Plumbing Rough-in | 7/15/1996 | 7/16/1996 | 7/16/1996 | A | FAIL |
Gerry Varner
|
|
|
07/16/96 323 - CORRECTIONS NEEDED
|
INSP - Plumbing Rough-in | 7/5/1996 | 7/5/1996 | 7/5/1996 | P | PART |
Gary Ziegler
|
|
|
BIG SKY ENTERTAINMENT-2 HANDICAP TOILETS 3 TOILETS, 1 URINAL 1 WATER HEATER-$4,500.00 kitchen area only needs flooor drains in restrooms
|