INSP - Plumbing Rough-in | 8/21/1996 | 8/21/1996 | 8/21/1996 | P | PASS |
Jim Soden
|
|
|
NO NUMBER ON HOUSE -- NEW PORCH IS BEING ADDED.
|
INSP - Plumbing Rough-in | 8/2/1996 | 8/2/1996 | 8/2/1996 | | PART |
Jim Soden
|
|
|
/ / 347 - CONFERENCE AND PARTIAL R/I O/K 8/2/6 347
|
INSP - Conference | 7/31/1996 | 7/31/1996 | 7/31/1996 | | PART |
Jim Soden
|
|
|
/ / 347 - conference 347
|
INSP - Conference | 7/30/1996 | 7/30/1996 | 7/30/1996 | | FAIL |
Jim Soden
|
|
|
/ / 347 - CONFERENCE 7/30/6 347
|
INSP - Conference | 7/29/1996 | 7/29/1996 | 7/29/1996 | P | PART |
Jim Soden
|
|
|
SHE WILL CALL TO SET TIME
|