INSP - Final | 12/6/1996 | 12/6/1996 | 12/6/1996 | P | PASS |
Bill VanDegrift
|
|
|
12/06/96 330 - AROUND 4:00
|
INSP - Plumbing Rough-in | 8/15/1996 | 8/16/1996 | 8/16/1996 | A | PASS |
Bill VanDegrift
|
|
|
08/16/96 330 -
|
INSP - Plumbing Rough-in | 8/15/1996 | 8/15/1996 | 8/15/1996 | P | CANC |
Bill VanDegrift
|
|
|
RE-INSPECTION AS LATE AS POSSIBLE THIS AFTERNOON (AFTER 3:30PM)
|
INSP - Plumbing Rough-in | 8/1/1996 | 8/1/1996 | 8/2/1996 | P | FAIL |
Bill VanDegrift
|
|
|
08/01/96 330 - FIXTURE COUNT- 15 18 fu, test water system, mid-stoty st pb,check manufacturers crimp ring installation requirements -some have l space from end of pipe.
|