INSP - Plumbing Rough-in | 8/26/1996 | 8/26/1996 | 8/26/1996 | P | PASS |
Stan Johnson
|
|
|
REINSPECTION
|
INSP - Plumbing Rough-in | 8/22/1996 | 8/22/1996 | 8/22/1996 | P | |
Stan Johnson
|
|
|
3-WC 4-LAV 3-TS 1-KS 1-WH 1-WB THIS WAS STARTED BY HARRISON PLM AND YOU PASSED THE GROUND WORK UNDER THEIR PERMIT ON 7/15. THIS PLUMMER IS TAKING OVER THE JOB. AJB
|
INSP - Plumbing Rough-in | 8/22/1996 | 8/22/1996 | 8/22/1996 | | FAIL |
Bill VanDegrift
|
|
|
/ / 330 - move water and trap for tub into heated area
|