INSP - Final | 11/12/1996 | 11/12/1996 | 11/12/1996 | P | PASS |
Stan Johnson
|
|
|
11/12/96 352 -
|
INSP - Plumbing Rough-in | 9/24/1996 | 9/24/1996 | 9/24/1996 | P | PASS |
Stan Johnson
|
|
|
09/24/96 352 -
|
INSP - Plumbing Rough-in | 9/4/1996 | 9/4/1996 | 9/4/1996 | P | PASS |
Stan Johnson
|
|
|
09/04/96 352 - 3-WC 4-LAV 2-TS 1-SH 1-KS 1-WH 1-WB ground work
|