INSP - Conference | 4/10/1997 | 4/10/1997 | 4/10/1997 | A | FAIL |
Gary Ziegler
|
|
|
sent meridian , correction notice, instructing they on testing backwater valve, and rain drains. and deck clamps, on roof drains gz
|
INSP - Sewer and Water lines | 10/7/1996 | 10/7/1996 | 10/7/1996 | P | PASS |
Gary Ziegler
|
|
|
REIN
|
INSP - Ground work | 10/4/1996 | 10/4/1996 | 10/4/1996 | | FAIL |
Gary Ziegler
|
|
|
/ / 334 - placement of backwaater valve incorrect, also upon visiting like roof drains installed ins basement floor and walls with 3034 sewer pipe , I had a conversation with dennis butterfield
|
INSP - Ground work | 10/4/1996 | 10/4/1996 | 10/4/1996 | | FAIL |
Gary Ziegler
|
|
|
/ / 334 - placement of backwaater valve incorrect, also upon visiting like roof drains installed ins basement floor and walls with 3034 sewer pipe , I had a conversation with dennis butterfield
|
INSP - Ground Work/Sewer/Water | 10/4/1996 | 10/4/1996 | 10/4/1996 | P | CANC |
Gary Ziegler
|
|
|
10/04/96 334 - RE-INSPECTION ì
|
INSP - Sewer line | 10/4/1996 | 10/4/1996 | 10/4/1996 | | PASS |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Sewer line | 10/4/1996 | 10/4/1996 | 10/4/1996 | | PASS |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Water lines | 10/4/1996 | 10/4/1996 | 10/4/1996 | | PASS |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Water lines | 10/4/1996 | 10/4/1996 | 10/4/1996 | | PASS |
Gary Ziegler
|
|
|
/ / 334 -
|
INSP - Sewer and Water lines | 10/3/1996 | 10/3/1996 | 10/3/1996 | P | NR |
Gary Ziegler
|
|
|
10/03/96 334 -
|
INSP - Sewer and Water lines | 10/2/1996 | 10/2/1996 | 10/2/1996 | P | NR |
Gary Ziegler
|
|
|
10/02/96 334 - READY AFTER 3:00/ IF YOU ARE TO BUSY AFTER 3:00, TOMMORRO no address
|