INSP - Final | 2/14/1997 | 2/18/1997 | 2/18/1997 | A | PASS |
Jim Soden
|
|
|
02/18/97 347 - REINSPECTION
|
INSP - Final | 2/14/1997 | 2/14/1997 | 2/14/1997 | P | FAIL |
Jim Soden
|
|
|
02/14/97 347 - early pm. 3rd floor needs airgap on i/m drain or dbl cck on water supply to it 347 2/14/ 97
|
INSP - Final | 1/30/1997 | 1/30/1997 | 1/30/1997 | P | PART |
Jim Soden
|
|
|
01/30/97 347 - temp. occ. 2nd sink to be installed by tenant final at that time
|
PLM - Partial final | 1/29/1997 | 1/29/1997 | 1/29/1997 | P | FAIL |
Jim Soden
|
|
|
01/29/97 347 - needs first kit. drain hooked up with a vent other sink not ready
|
INSP - Plumbing Rough-in | 12/18/1996 | 12/18/1996 | 12/18/1996 | | PASS |
Jim Soden
|
|
|
/ / 347 - CORRECTIONS MADE
|
INSP - Final | 12/16/1996 | 12/16/1996 | 12/16/1996 | | CANC |
Jim Soden
|
|
|
/ / 347 - NOT READY THIS SHOULD HAVE BEEN A R/I
|
INSP - Final | 12/16/1996 | 12/16/1996 | 12/16/1996 | P | FAIL |
Jim Soden
|
|
|
12/16/96 347 - 3rd floor comstock and bush NO ONE AROUND
|
INSP - Plumbing Rough-in | 12/16/1996 | 12/16/1996 | 12/16/1996 | | CANC |
Jim Soden
|
|
|
/ / 347 - SHOULD NOT HAVE BEEN CAALLED FINAL ONLY
|
INSP - Plumbing Rough-in | 12/2/1996 | 12/2/1996 | 12/2/1996 | | PASS |
Jim Soden
|
|
|
/ / 347 - reinspection conference
|
INSP - Plumbing Rough-in | 11/27/1996 | 12/2/1996 | 12/2/1996 | A | FAIL |
Jim Soden
|
|
|
12/02/96 347 - THE MODE BUILDING- 3RD FLOOR/ COMSTOCK AND BUSH LAW OFFIC west sink not not vented---copper pipes need protecttion from sheet metal
|